Completed Projects

North Reservoir
Oak Harbor, WA
Construction and installation of a design-build, 4 million gallon water reservoir tank.
Oak Harbor, WA
Construction and installation of a design-build, 4 million gallon water reservoir tank.
Client: City of Oak Harbor
Completion Date: August 2014
Project Value: $4,148,105
Completion Date: August 2014
Project Value: $4,148,105

SERA Campus Playground & Sprayground
Tacoma, WA
Construction of a new playground and sprayground.
Client: Metro Parks Tacoma.
Completion Date: June 2014
Project Value: $2,967,908
Tacoma, WA
Construction of a new playground and sprayground.
Client: Metro Parks Tacoma.
Completion Date: June 2014
Project Value: $2,967,908

Highline Community College Building 4 Aircraft Noise Reduction and Modernization
Des Moines, WA
Renovation, modernization, and sound proofing of the Performing Arts building at Highline Community College.
Client: MacDonald-Miller Facility Solutions
Completion: August 2013
Project Value: $2,200,179
Des Moines, WA
Renovation, modernization, and sound proofing of the Performing Arts building at Highline Community College.
Client: MacDonald-Miller Facility Solutions
Completion: August 2013
Project Value: $2,200,179

Renovate Dorms 564, 565, & 567 Joint Base Lewis-McChord, WA
Renovation of three separate, three-story dormitory buildings with a total of 326 units. Project involved selective demolition, asbestos abatement, interior upgrades, and a new PTAC system.
Client: Department of the Air Force
Completion: April 2013
Project Value: $8,019,250
Renovation of three separate, three-story dormitory buildings with a total of 326 units. Project involved selective demolition, asbestos abatement, interior upgrades, and a new PTAC system.
Client: Department of the Air Force
Completion: April 2013
Project Value: $8,019,250

MLA Backlighting Repairs
Naval Base Kitsap Bangor
Silverdale, WA
Design-build contract for the replacement of all the backlights and electrical infrastructure along the perimeter in the Main Limited Area; spanning almost 4 miles.
Client: Department of the Navy
Completion: February 2013
Project Value: $2,943,073
Naval Base Kitsap Bangor
Silverdale, WA
Design-build contract for the replacement of all the backlights and electrical infrastructure along the perimeter in the Main Limited Area; spanning almost 4 miles.
Client: Department of the Navy
Completion: February 2013
Project Value: $2,943,073

P-980 Security Force Company Armory
Naval Base Kitsap Bangor
Silverdale, WA
Design-build contract for the renovation and addition of an existing warehouse into an armory building and distribution center.
Client: Department of the Navy
Completion: January 2013
Project Value: $1,310,071
Naval Base Kitsap Bangor
Silverdale, WA
Design-build contract for the renovation and addition of an existing warehouse into an armory building and distribution center.
Client: Department of the Navy
Completion: January 2013
Project Value: $1,310,071

Refurbish Track and Sports Field
NAS Whidbey Island, WA
Design/build contract to refurbish playing field into a synthetic surface, multi-purpose playing field with an asphalt running track.
Client: Department of the Navy
Completion: October 2012
Project Value: $1,394,126
NAS Whidbey Island, WA
Design/build contract to refurbish playing field into a synthetic surface, multi-purpose playing field with an asphalt running track.
Client: Department of the Navy
Completion: October 2012
Project Value: $1,394,126

Freight Elevator Replacement
VA Puget Sound Health Care
Seattle, WA
Demolition and replacement of a freight elevator in Building 1 of the VA Puget Sound Health Care System in Seattle, WA.
Client: Department of Veterans Affairs
Completion: June 2012
Project Value: $604,919
VA Puget Sound Health Care
Seattle, WA
Demolition and replacement of a freight elevator in Building 1 of the VA Puget Sound Health Care System in Seattle, WA.
Client: Department of Veterans Affairs
Completion: June 2012
Project Value: $604,919

Install Active Vehicle Barriers
Naval Base Kitsap Bangor
Silverdale, WA
Design/build contract for a secure, active, vehicle barrier system at the Trident and Trigger gates.
Client: Department of the Navy
Completion: May 2012
Project Value: $1,319,872
Naval Base Kitsap Bangor
Silverdale, WA
Design/build contract for a secure, active, vehicle barrier system at the Trident and Trigger gates.
Client: Department of the Navy
Completion: May 2012
Project Value: $1,319,872

Medical Dental Clinic Renovation, B/2050
Naval Base Kitsap Bangor
Silverdale, WA
Renovation of the medical dental clinic at Naval Base Kitsap. Project included selective demolition, asbestos abatement, interior upgrades, and a new HVAC system with new DDC controls. A new section was added to provide additional offices and exam rooms. Project was phased to accommodate the occupied clinic.
Client: Department of the Navy
Completion: April 2012
Project Value: $6,857,080
Naval Base Kitsap Bangor
Silverdale, WA
Renovation of the medical dental clinic at Naval Base Kitsap. Project included selective demolition, asbestos abatement, interior upgrades, and a new HVAC system with new DDC controls. A new section was added to provide additional offices and exam rooms. Project was phased to accommodate the occupied clinic.
Client: Department of the Navy
Completion: April 2012
Project Value: $6,857,080

P-022 Child Development Center
NAS Whidbey Island
Oak Harbor, WA
Design-build project for the construction of a child care development center for 218 children. The building is approximately 31,000 SF, and the site is over 6.5 acres and includes 2 separate parking lots, site utilities, landscaping and state of the art playground equipment. This project earned LEED GOLD certification. Some of the LEED energy enhancements for gold level included wind turbines, solar panels, LED lighting throughout the building, and the installation of equipment for a future geo-thermal ground source heating system.
Client: Department of the Navy
Completion: October 2011
Project Value: $12,289,296
NAS Whidbey Island
Oak Harbor, WA
Design-build project for the construction of a child care development center for 218 children. The building is approximately 31,000 SF, and the site is over 6.5 acres and includes 2 separate parking lots, site utilities, landscaping and state of the art playground equipment. This project earned LEED GOLD certification. Some of the LEED energy enhancements for gold level included wind turbines, solar panels, LED lighting throughout the building, and the installation of equipment for a future geo-thermal ground source heating system.
Client: Department of the Navy
Completion: October 2011
Project Value: $12,289,296

Heating Oil Tank Modernizations
Naval Air Magazine
Indian Island, WA
Heating oil tank replacement and modernizations to 9 underground and 4 above ground heating oil tanks at various locations within NAVMAG Indian Island. The 9 underground fuel storage tanks were replaced with both brine and dry interstitial double wall tanks ranging in size from 1000 gallons to 5000 gallons. The 4 above-ground tanks were modernized to include schedule 40 double-wall steel secondary containment piping with fuel leak sensor containment boxes.
Client: Department of the Navy
Completion: September 2011
Project Value: $1,032,082
Naval Air Magazine
Indian Island, WA
Heating oil tank replacement and modernizations to 9 underground and 4 above ground heating oil tanks at various locations within NAVMAG Indian Island. The 9 underground fuel storage tanks were replaced with both brine and dry interstitial double wall tanks ranging in size from 1000 gallons to 5000 gallons. The 4 above-ground tanks were modernized to include schedule 40 double-wall steel secondary containment piping with fuel leak sensor containment boxes.
Client: Department of the Navy
Completion: September 2011
Project Value: $1,032,082

Renovate Records and Dispatch, B19
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
10,000 SF alteration and renovation of the Building 19 warehouse at the Tacoma VA hospital for future use as the VA Puget Sound Healthcare Network Dispatch Center and Medical Records storage facility. Work included complete interior, mechanical and electrical demolition with partial concrete/masonry wall and floor removal. Complete installation of new offices, open administration areas, patient waiting and registration areas, mailroom, emergency monitoring and dispatch offices on raised access flooring, HVAC with direct digital controls, plumbing, fire suppression, electrical, and voice,data and security access controls.
Client: Department of Veterans Affairs
Completion: May 2011
Project Value: $1,555,252
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
10,000 SF alteration and renovation of the Building 19 warehouse at the Tacoma VA hospital for future use as the VA Puget Sound Healthcare Network Dispatch Center and Medical Records storage facility. Work included complete interior, mechanical and electrical demolition with partial concrete/masonry wall and floor removal. Complete installation of new offices, open administration areas, patient waiting and registration areas, mailroom, emergency monitoring and dispatch offices on raised access flooring, HVAC with direct digital controls, plumbing, fire suppression, electrical, and voice,data and security access controls.
Client: Department of Veterans Affairs
Completion: May 2011
Project Value: $1,555,252

Gold Clinic Remodel
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Design-build renovation of 5,130 SF of the south wing of Building 81 for the expansion of the Gold Clinic. Project design and construction included interior architectural, communications & data systems, HVAC systems, fire sprinkler/alarm systems, electrical, and utility provisions for new equipment.
Client: Department of Veterans Affairs
Completion: February 2010
Project Value: $220,636
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Design-build renovation of 5,130 SF of the south wing of Building 81 for the expansion of the Gold Clinic. Project design and construction included interior architectural, communications & data systems, HVAC systems, fire sprinkler/alarm systems, electrical, and utility provisions for new equipment.
Client: Department of Veterans Affairs
Completion: February 2010
Project Value: $220,636
Additional Completed Projects by Veterans NW Construction
Building 13 Energy Upgrades
VA Puget Sound Health Care System
Seattle, WA
Replacement of the existing water chiller outside of Building 13 with a 200-ton oil free frictionless magnetic bearing air cooled centrifugal water chiller. Project also included new acoustical ceiling tile for rooms, reconfiguring lighting, and updating lighting controls.
Client: Department of Veterans Affairs
Completion: January 2011
Project Value: $596,967
VA Puget Sound Health Care System
Seattle, WA
Replacement of the existing water chiller outside of Building 13 with a 200-ton oil free frictionless magnetic bearing air cooled centrifugal water chiller. Project also included new acoustical ceiling tile for rooms, reconfiguring lighting, and updating lighting controls.
Client: Department of Veterans Affairs
Completion: January 2011
Project Value: $596,967
Replace Steamlines Phase II
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Demolition of the existing steam boiler system and installation of a new gas heating system. Included tying into the main gas line and bringing into the mechanical room for the new gas heating system.
Client: Department of Veterans Affairs
Completion: October 2011
Project Value: $384,228
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Demolition of the existing steam boiler system and installation of a new gas heating system. Included tying into the main gas line and bringing into the mechanical room for the new gas heating system.
Client: Department of Veterans Affairs
Completion: October 2011
Project Value: $384,228
Electrical Distribution Upgrade of Bldg 11 & 23
VA Puget Sound Health Care System
Seattle, WA
Project involved upgrading the secondary electrical service to Bldg 11 & Bldg 23 at the VA Puget Sound Health Care System in Seattle, WA.
Client: Department of Veterans Affairs
Completion: August 2011
Project Value: $170,829
VA Puget Sound Health Care System
Seattle, WA
Project involved upgrading the secondary electrical service to Bldg 11 & Bldg 23 at the VA Puget Sound Health Care System in Seattle, WA.
Client: Department of Veterans Affairs
Completion: August 2011
Project Value: $170,829
Install Chain Link Fence
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Installation of a chain link fence approximately 300 lineal feet and six feet high with a 12 foot wide gate consisting of two six foot sections.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $8,629
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Installation of a chain link fence approximately 300 lineal feet and six feet high with a 12 foot wide gate consisting of two six foot sections.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $8,629
Connect Medical Oxygen
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Project involved connecting and certifying operation of an existing 900 gallon bulk oxygen tank.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $45,092
VA Puget Sound Health Care System
American Lake Campus
Tacoma, WA
Project involved connecting and certifying operation of an existing 900 gallon bulk oxygen tank.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $45,092
Radioisotope Fan and Duct
VA Puget Sound Health Care System
Seattle, WA
Replacement of existing exhaust fan and running new exhaust stack to exhaust hood.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $39,495
VA Puget Sound Health Care System
Seattle, WA
Replacement of existing exhaust fan and running new exhaust stack to exhaust hood.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $39,495
Building 7 Transformer
VA Puget Sound Health Care System
Seattle, WA
Installation of a 3 phase 208 VAC power supply for Building 7.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $71,157
VA Puget Sound Health Care System
Seattle, WA
Installation of a 3 phase 208 VAC power supply for Building 7.
Client: Department of Veterans Affairs
Completion: July 2010
Project Value: $71,157